
First published at nofibs.com.au
The Port Augusta community have called for South Australian Premier Jay Weatherill to step up to help fund construction of a solar thermal power station. The call from Repower Port Augusta comes in reponse to an Alinta Energy assessment (Draft Milestone 3 Balance of Study Report March 2015 PDF) that found a solar thermal power station was still uneconomic to build without government support. The proposed 50MW project is estimated to cost $577 million, about $150 million greater than it's commercial viability.
Australia currently does not have any 'baseload' concentrating solar thermal with molten salt energy storage power plants. The Port Augusta proposed power station could be Australia's first using a Concentrating Solar Thermal (CST) power tower with up to 15 hours molten salt energy storage included.
These type of CST plus molten salt energy storage power plants are already producing electricity or under construction at Crescent Dunes in Nevada, USA (110MW), Gemasolar in AndalucĂa, Spain (20MW), Planta Solar Cerro Dominador at Calama, Chile (110MW under contruction), Rice Solar energy project in California, USA (150MW), and Supcon Solar Project in China (50MW under construction).